Megalodon Thunder

Pages

  • Home
  • Meet the Team
  • ROV Design & Specifications

Friday, May 22, 2015

5/20/2015
The motors are now fully waterproof. The wiring is all connected to the motors and the wax is holding it all together in a plastic tube so water will not get in. The piping is almost all cut to the lengths needed for the best ROV. Tomorrow cutting the pipe and building the frame will need to be finished.

Posted by Unknown at 9:53 AM
Email ThisBlogThis!Share to XShare to FacebookShare to Pinterest

No comments:

Post a Comment

Newer Post Older Post Home
Subscribe to: Post Comments (Atom)

Contributors

  • Mrs_S
  • Unknown
  • Unknown
  • Unknown

Blog Archive

  • ▼  2015 (14)
    • ▼  May (14)
      • 5-28-15 Today we put the ROV into water. It was ha...
      • 5-27-15 Today Eric and Austin finished attaching e...
      • 5-22-15 Today the motors got attached. Austin put ...
      • 5/28/15 Today we went to the big pool to test our ...
      • 5/27/15 Today we assembled the ROV together and we...
      • 5/22/15 Today I was absent but my group did a good...
      • 5/21/2015 The frame has been build. We drilled hol...
      • 5/20/2015 The motors are now fully waterproof. The...
      • 5/21/15 Today we finished attaching the propellers...
      • 5/20/15 Today what has to be done is cutting the ...
      • 5/19/15 Today I was able to finish taping the mot...
      • 5/18/15 Today I was unable to make it to class, s...
      • Megalodon Thunder has a structure now. Our team ju...
      • Daily blog post: We have decided on a final design...
Simple theme. Powered by Blogger.