Megalodon Thunder

Pages

  • Home
  • Meet the Team
  • ROV Design & Specifications

Friday, May 29, 2015

5-27-15
Today Eric and Austin finished attaching everything to the ROV. We attached a black netting to the bottom. Austin but on the flotation device to the top of the ROV. Eric zip tied the wire that connects the controller to the ROV to the Black netting so if we pull the cable we wont pull on off the motor cables. Tomorrow we will do a buoyancy test in the small pool.
Posted by Unknown at 10:25 AM
Email ThisBlogThis!Share to XShare to FacebookShare to Pinterest

No comments:

Post a Comment

Newer Post Older Post Home
Subscribe to: Post Comments (Atom)

Contributors

  • Mrs_S
  • Unknown
  • Unknown
  • Unknown

Blog Archive

  • ▼  2015 (14)
    • ▼  May (14)
      • 5-28-15 Today we put the ROV into water. It was ha...
      • 5-27-15 Today Eric and Austin finished attaching e...
      • 5-22-15 Today the motors got attached. Austin put ...
      • 5/28/15 Today we went to the big pool to test our ...
      • 5/27/15 Today we assembled the ROV together and we...
      • 5/22/15 Today I was absent but my group did a good...
      • 5/21/2015 The frame has been build. We drilled hol...
      • 5/20/2015 The motors are now fully waterproof. The...
      • 5/21/15 Today we finished attaching the propellers...
      • 5/20/15 Today what has to be done is cutting the ...
      • 5/19/15 Today I was able to finish taping the mot...
      • 5/18/15 Today I was unable to make it to class, s...
      • Megalodon Thunder has a structure now. Our team ju...
      • Daily blog post: We have decided on a final design...
Simple theme. Powered by Blogger.